Day three of timber system installation went well as you can see from these pictures. The crane left at lunch time and the conventional framing crew arrived shortly thereafter to build the gable walls. Steven and Sage made a good start installing decking. We are hopeful we can get the additional decking needed tomorrow. Both crews will be working tomorrow to get as much dried in as possible to protect the wood. The timber work on this structure is excellent and beautiful and your guys are doing a great job installing it. I am sorry you had to hold it for so long and really appreciate how you did the refinishing work. Andy and Jose, I can’t tell you how much we appreciate the way you guys worked together today and what you accomplished. Great Work!